Installation Guide

Disclaimer

  • Before Drilling check for water, electrical or gas services. Failure to locate can cause serious injury, fire or death.
  • Confirm the structural integrity of the wall can support the desired weight (upwards of 15kg)
  • Do not install stow products above walkways, people or workspaces.

New arrivals

New arrivals

New arrivals

Usage requirements

  • ensure stow is fitted level and securely.
  • ensure gear and roller surfaces are clean (dust build-up reduces grip). if surfaces are unclean please wipe clean with a damp cloth
  • ensure area of use is clear and without obstruction